Pro is launching soonDES simulation, ISO PDF export, and advanced workspace. Free analytical tools are fully available now.
ELEVATORDYNAMICSENGINE

Guide / Saturation

Saturation

  • KPI
  • DES

The demand at which the group can no longer clear the traffic offered to it.

Where: DES results / ISO benchmark study · PDF Appendix B

Affects

  • Whether the group clears offered demand in the benchmark series

Defaults & traps

  • A run saturates when passengers are left behind or delivered throughput falls >5% short of offered traffic.
Open in simulator →

All fields and KPIs · Open the lift traffic simulator